Talking to Atlas
Open the team’s Chat tab. Give Atlas the goal plus constraints, and say what done looks like:“Ship a pricing page this week. Use the existing design system. Frontend builds it, QA verifies it on mobile, and check with me before changing the nav.”
Quick Briefs
Ready-made prompts available in Atlas chat for common asks:Slash commands
Atlas carries the Manager skill set. The most useful in chat:/think: pressure-test an idea before building starts/delegate: break a goal into tasks and assign specialists/status: pull progress, blockers, completion state/pipeline: run strategy, design, and engineering reviews/launch: run the shipping workflow (tests, review, changelog, PR)/safeguard: tighten safety controls before risky operations/scope: keep agent work constrained to intended files/reflect: run a retrospective/learn: save important context and decisions to team memory
Assigning work yourself
You do not have to route everything through conversation. Open the slash menu and choose Assign task: pick the agent, describe the work, and choose how it starts: Notify (sends the work without starting immediately), Start (begins immediately), or Flag (waits for your decision).Where your attention goes
Atlas routes everything into three panels (full detail in Tasks):- User Tasks: decisions, approvals, and questions waiting on you. You act on these.
- Agent Tasks: the work board. You watch; you rarely need to act.
- Task Health: Atlas’s cleanup queue. Glance at it if clutter piles up, then Nudge Manager or Sweep stale tasks.
Interruption Level
Team Settings includes an Interruption Level that controls how often Atlas stops and asks you:
Start with Balanced. Drop to Minimal once you trust the team on a project; raise to Hands-on or Manual for risky or unfamiliar work.
Updates from the team
The Show updates from agents checkbox in Atlas chat controls whether short “Update from [agent]” digests appear inline as teammates report progress. The setting is remembered per team.Use Atlas well
- Give the goal and the constraints, not a step list. Atlas plans better than it follows micro-instructions.
- Use Quick Briefs instead of scrolling history when you return to a team.
- When the chat gets noisy, ask Atlas to restate the current plan in one message.
- If Atlas seems stuck or stale, the Guide to Atlas button (question mark in the chat header) summarizes all of these mechanics in-app.

